LPSThe Last Planner System® is a lean approach to planning and delivering projects. It is based on a hierarchy of planning: should, can, will, and did. LPS is not a computer system. It is a set of protocols corresponding with the four above items: pull planning, look-ahead planning, task planning, and daily coordination.
The Last Planner System is a registered trademark of the Lean Construction Institute.
Last Planner SystemThe Last Planner System® is a lean approach to planning and delivering projects. It is based on a hierarchy of planning: should, can, will, and did. LPS is not a computer system. It is a set of protocols corresponding with the four above items: pull planning, look-ahead planning, task planning, and daily coordination.
The Last Planner System is a registered trademark of the Lean Construction Institute.
Related Posts
- The Added Work of Rework
Promises and Prescriptions
Part 2 - The Added Work of Rework, by Frank Patrick
"There's never time to do it right,...
- Sharing PPC Results in Trust-Worthiness
Unreliable or unexpected behavior of trade contractors in allocating resources is a major source of variation in const...
- Time to Increase OSHA Fines
Safety Thursday
Work Injury Free There have been many news stories in the last two weeks announcing fines handed out by...
- Not Even Toyota Is Flawless
I often gush over Toyota's lean design and manufacturing. BW writes Even Toyota Isn't Perfect calling attention to the ...
- PPC Macro Available for MS Project
Kudos to Brian Michael Kennemer!! He just published in Projectified an add-in macro for MS Project that calculates Per...
This entry was posted
on Sunday, October 14th, 2007 at 4:26 pm and is tagged: asides.
You can follow any responses to this entry through the RSS 2.0 feed.
You can skip to the end and leave a response. Pinging is currently not allowed.
Convert this post to a PDF document.