With tongue-in-cheek, The Boston Globe writes, Creating Flawless Products No One Wants. Don't miss it.
LPSThe Last Planner System® is a lean approach to planning and delivering projects. It is based on a hierarchy of planning: should, can, will, and did. LPS is not a computer system. It is a set of protocols corresponding with the four above items: pull planning, look-ahead planning, task planning, and daily coordination.
The Last Planner System is a registered trademark of the Lean Construction Institute.
Last Planner SystemThe Last Planner System® is a lean approach to planning and delivering projects. It is based on a hierarchy of planning: should, can, will, and did. LPS is not a computer system. It is a set of protocols corresponding with the four above items: pull planning, look-ahead planning, task planning, and daily coordination.
The Last Planner System is a registered trademark of the Lean Construction Institute.
Related Posts
- Wondering about Six Sigma?
Read Six Sigma for Dummies. While it's written for the beginner, it will introduce you to the key 6σ concepts. ...
- How Significant Is Six Sigma?
At the Six Sigma Blog they look at the 99% world to show The Significance of Six Sigma. At 99% 50 babies would be dropp...
- What Battle?
Iget a kick out of the sparring that goes on between lean, six sigma, TQM, and Theory of Constraints (TOC). One of my...
- Point Your Finger at Lean Six Sigma
There's a new kid (blog) on the block. He calls himself the Lean Six Sigma Academy, a.k.a. Ron Pereira. He's not afr...
- Shore Up Project Leadership
Project leadership can be the make-or-break factor for project success. The 6σ folk have some good advice for any...
This entry was posted
on Sunday, February 11th, 2007 at 8:50 pm and is tagged: asides.
You can follow any responses to this entry through the RSS 2.0 feed.
You can skip to the end and leave a response. Pinging is currently not allowed.
Convert this post to a PDF document.