At the Six Sigma Blog they look at the 99% world to show The Significance of Six Sigma. At 99% 50 babies would be dropped in hospitals each day.
LPSThe Last Planner System® is a lean approach to planning and delivering projects. It is based on a hierarchy of planning: should, can, will, and did. LPS is not a computer system. It is a set of protocols corresponding with the four above items: pull planning, look-ahead planning, task planning, and daily coordination.
The Last Planner System is a registered trademark of the Lean Construction Institute.
Last Planner SystemThe Last Planner System® is a lean approach to planning and delivering projects. It is based on a hierarchy of planning: should, can, will, and did. LPS is not a computer system. It is a set of protocols corresponding with the four above items: pull planning, look-ahead planning, task planning, and daily coordination.
The Last Planner System is a registered trademark of the Lean Construction Institute.
Related Posts
- Wondering about Six Sigma?
Read Six Sigma for Dummies. While it's written for the beginner, it will introduce you to the key 6σ concepts. ...
- What Battle?
Iget a kick out of the sparring that goes on between lean, six sigma, TQM, and Theory of Constraints (TOC). One of my...
- Point Your Finger at Lean Six Sigma
There's a new kid (blog) on the block. He calls himself the Lean Six Sigma Academy, a.k.a. Ron Pereira. He's not afr...
- Shore Up Project Leadership
Project leadership can be the make-or-break factor for project success. The 6σ folk have some good advice for any...
- The Lean Six Sigma Elephant in the Room
I am cautious writing this post. Some people have been calling attention to an elephant in the room. KT Cat is one o...
This entry was posted
on Tuesday, December 26th, 2006 at 4:42 pm and is tagged: asides.
You can follow any responses to this entry through the RSS 2.0 feed.
You can skip to the end and leave a response. Pinging is currently not allowed.
Convert this post to a PDF document.